April 2020: designing and modelling with SketchUp
April 26, 2020: breaking down the old garden shed.
April 29, 2020: picking up the steel pier.
May 5, 2020: delivery of the steel screw pile foundation.
May 8, 2020: setting out the timber formwork for the shed.
May 20, 2020: a little rebar in the timber formwork.
May 9, 2020: pouring concrete in the formwork.
May 9, 2020: watching concrete dry...
May 15, 2020: fixing the stud bolts in a template.
May 16, 2020: digging for gold...
May 16, 2020: turning the screw pile - below the concrete base - into the ground
May 16, 2020: centering the formwork for the concrete base.
May 17, 2020: pouring concrete in the formwork of the base and centering the template with stud bolts for anchoring the pier.
May 17, 2020: dad relaxing after helping with pouring the concrete.
May 20, 2020: placing (and leveling) the pier on the concrete base.
May 21, 2020: new black paint coating on the pier.
May 21, 2020: quick test mounting the Mach1 on the pier.
May 21, 2020: solid as a rock.
May 22, 2020: floor filled with sand.